top of page

PROJECTS

Take A Look Below At Some of Our Recently Completed Projects!

Design - Build

 

BFIT Taft, TN 2016

  • 120 acre irrigation project.

  • 472.5 million gallons of water storage

  • 550,000 cubic yards of dirt moved in 6 months

  • Piping system with 4,000 -   5,000 gallons/min pumps to feed  23 irrigation center pivot systems.

 

Kinnard Mill at Bragg Farms, Madison County, AL 2015 - 2016

  • 8 acre lake

  • 52, 000 cy of grading cu.yds. topsoil and cut.

  • 95 Acre-Ft of water storage

  • 350 acre farm to be irrigated

Municipal - Federal - Military Contractor Projects

 

Town of Madison, AL 2015

  • Mass grading for 1 mile divided highway

BRF-0020 Lawrence County 2015-2017

  • Trucking haul off from mass excavation and bridge site prep

Raytheon AUR Missile Facility-Huntsville (Redstone Arsenal), AL 2012

  • 45 acre site demolition, grading, storm utilities and paving project including OSHA

  • HAZWOPER certifications for dealing with site soil conditions

 

Gate 7 Access Control Point- Huntsville (Redstone Arsenal), AL 2011

  • Reconfiguration of Gate 7 entrance complex including demo of old guardhouse, fencing, and existing roadway and new grading, underground utilities, paving, and landscaping

 

Commercial - Educational Site Projects

 

Oakwood University Wellness Center and Athletics Fields, 2017

  • Demolition of existing track and baseball fields, and reconfiguration of site for regulation fields

  • Installed parking lot for future wellness center

Jemison/McNair High School Huntsville, AL 2015

  • 51 acre project to install storm sewer, implement fine grading and respread topsoil

Walmart Market, Madison, AL 2014

  • Provided full site prep including clearing, storm sewer and grading for building pad

WalMart SuperStore Florence, AL 2013

  • 25 acre wooded site required clearing, erosion control, grading, and storm sewer activities.

  • Aggressive timeles was imposed, and despite extra rainfall, store opened on time.

  • 150,000 cubic yards of dirt was managed on the site, and 5,000 feet of storm sewer pipe was laid

Flood Control/Irrigation Projects

 

Bragg Farms Irrigation Reservoir-Toney, AL 2010

  • 12 acre design/build/construct of 100 acre-ft reservoir for capture and storage of water for cropland irrigation

 

Red Oak Ranch Irrigation and Wildlife Enhancement Reservoir- Booneshill, TN

  • Design assist/construction of 30 acre reservoir including dam construction and underwater fish habitat structures, and spillway